Monday, September 21, 2009

Thursday, September 17, 2009

More pictures of the slab






The newest slab photos 9-17-09

View of the front of the house

View of the master side of the house

View of the drain to the right of the entry

This is a picture of the beams at the master bathroom

This is the Beam at the back of the Gator Garage. The height is about 13 feet.

This is the beam on the outside of the master patio area

This is a picture of the terrace level from the master bedroom trellis area

This is the beam at the stairs. It is 11'6" high.

These are the beams at the garage area

This is the compactor used to compact the base

Tuesday, September 1, 2009

Slab make up

Looking down at the Terrace level of the house. The beams are formed. The concrete will be four inches above the base.

This is another picture of the beams on the terrace level. This is where the cave area will be.


This is a picture of the area where the stairs will be.


This is a picture of the terrace level


This picture is from the terrace level looking up. The two workers give a good perspective as to the height of the slab. The main floor height will be a little higher than the height of the worker on the second level.


This is the slab at the rear of the house where the patio will be off of the terrace level bedroom. The plywood form is four feet high. This part of the slab is right on the ranch road.


This is the same beam from above.


This is looking up from the gator garage.